Gaussian WellWorks
Gaussian WellWorks About Us How We Work Digital Reservoir Twins Fracture Diagnostics Well-Rate Forecasting Reserve Estimation Storage Capacity Estimation Economic Appraisals Free Trial →
Step 4 of 4 — Reservoir Optimization Process

Reserve Estimation

PRMS-compliant probabilistic reserves with P10/P50/P90 confidence intervals for SEC reporting and investment decisions.

P90

Conservative

High-confidence lower bound for SEC reporting and debt covenants.

P50

Best Estimate

Most likely outcome. Probabilistic aggregation converges here across the portfolio.

P10

Optimistic

Upside potential for acquisition evaluation and portfolio planning.

Pre-drilling Reserves

Digital permeability twin coupled with Gaussian simulator for fully probabilistic production forecasting and reserves estimation before a well is drilled.

Acreage Value Optimization

P90 optimization for acreage valuation and fair-value reporting. Certifiable reserves reporting with probabilistic aggregation converging to P50.

PRMS Compliant Certification

Probabilistic reserves and resources classification. PRMS = Petroleum Resource Management System (Society of Petroleum Engineers).

Certify your reserves with confidence

The final step in the Reservoir Optimization Process.

Page Layout
Mode
Style
Color Palette
Logo Animation