Pre- and post-drilling fracture diagnostics with 4 complementary methods for unmatched accuracy in fracture geometry prediction.
Predicts fracture half-length prior to drilling using pressure-dependent geomechanical properties. High-accuracy fracture half-length prediction.
First-of-its-kind: per-stage fracture half-length estimation using fracture job reports. No existing alternatives.
Volume balancing flow back volumes using elastic compliances and completion parameters. Independent validation of fracture effectiveness.
Derives fracture half-length directly from early-time production behavior, providing independent validation from early production response.
From pre-drilling design to post-drilling validation with 4 independent methods.